Please use this identifier to cite or link to this item: https://repository.sustech.edu/handle/123456789/16607
Full metadata record
DC FieldValueLanguage
dc.contributor.authorMahmood , Salma Yahia Mohamed
dc.contributor.authorHaroun , Ahmed Elamin
dc.contributor.authorLoghman ,Adil H. A.
dc.date.accessioned2017-04-25T07:24:33Z
dc.date.available2017-04-25T07:24:33Z
dc.date.issued2015
dc.identifier.citationMahmood , Salma Yahia Mohamed .A New Heuristic for Scheduling Optimization of Non-Repetitive Construction Projects Under Constrained Resources \ Salma Yahia Mohamed Mahmood ,. Ahmed Elamin Haroun , Adil H. A. Loghman .- Journal of Engineering and Computer Sciences (ECS) .- vol 16 , no1.- 2015.- articleen_US
dc.identifier.issnISSN 1605-427X
dc.identifier.urihttp://repository.sustech.edu/handle/123456789/16607
dc.descriptionarticleen_US
dc.description.abstractIn Sudan, the clients, contractors and consultants (stakeholders) suffer from the elongation of project completion time, especially in the case of limited resources. This problem results in the conflict among them, and hence leads to project delay that consequently influences the overall project cost. To solve this problem, data from ten construction projects executed in Khartoum state and other towns was collected, simulated and analyzed. Primavera software program was used as a simulator tool and sixteen selected heuristics were applied to the ten projects. Statistical and operational research tools combined with the existing heuristics, while considering best common practices in construction industry, were used. Lindo software, as a decision making tool, is then used to find the optimum solution, i.e., finding the minimum time to complete the project under limited resources. The results were then evaluated and, hence, concluded that the optimum solution of the extra needed time at its minimum possible rate to complete the project under limited resources was achieved as a result of implementing the heuristic of “minimum late start time”. This new “selectedd” heuristic optimizes the scheduling time of non-repetitive projects while considering the availability of limited resources.en_US
dc.description.sponsorshipSudan University of Science and Technologyen_US
dc.language.isoen_USen_US
dc.publisherSudan University of Science and Technologyen_US
dc.subjectNon-repetitive projects; Limited resources; Scheduling optimization; ;Heuristic.en_US
dc.titleA New Heuristic for Scheduling Optimization of Non-Repetitive Construction Projects Under Constrained Resourcesen_US
dc.typeArticleen_US
Appears in Collections:Volume 16 No. 1

Files in This Item:
File SizeFormat 
A New Heuristic for Scheduling ... .pdf924.93 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.