Please use this identifier to cite or link to this item: https://repository.sustech.edu/handle/123456789/16561
Full metadata record
DC FieldValueLanguage
dc.contributor.authorHaroun , Ahmed E.
dc.contributor.authorLoghman , Adil H. A.
dc.contributor.authorMahmoud , Salma Y. M .
dc.date.accessioned2017-04-23T11:35:46Z
dc.date.available2017-04-23T11:35:46Z
dc.date.issued2012
dc.identifier.citationHaroun , Ahmed E. . Scheduling Problem under Constrained Resources: A Historical Review of Solution Methods and Computer Application \ Ahmed E. Haroun ,Adil H. A. Loghman ,Salma Y. M . Mahmoud .- Journal of Engineering and Computer Sciences (ECS) .- vol 13 , no2.- 2012.- articleen_US
dc.identifier.issnISSN 1605-427X
dc.identifier.urihttp://repository.sustech.edu/handle/123456789/16561
dc.descriptionarticleen_US
dc.description.abstractIn construction projects, project execution time is a major concern of the involved stakeholders (client, contractors and consultants). Optimization of project scheduling through time control is considered as a critical factor in project management. Many studies were carried out and many models and software packages were developed since the fifties and till now, but no clear cut methods, to optimize resources while satisfying different constraints were found. The importance of the subject stemmed from the fact that project time completion affects the overall project cost. Considering the most two widely applied scheduling methods: Critical Path method (CPM) and Program Evaluation and Review Technique (PERT), it is found that negligence of handling limitation of resources is evident in most cases. On the other hand, a resource leveling technique which is used to reduce the sharp variations in the resource demand histogram cannot handle the issue of1 minimizing project duration since it is used when there are enough resources. So the leveling process is accomplished by shifting only the non-critical activities within their floats. This paper show a number of heuristics and models to solve scheduling problem of projects subjected to limited resources. Different heuristic methods applied in past studies were examined in order to be tested and applied in a simple example, as a pilot study, so as to be used in real complex projects.en_US
dc.description.sponsorshipSudan University of Science and Technologyen_US
dc.language.isoen_USen_US
dc.publisherSudan University of Science and Technologyen_US
dc.subjectProject time control/optimization, constrained resources, heuristics.en_US
dc.titleScheduling Problem under Constrained Resources: A Historical Review of Solution Methods and Computer Applicationen_US
dc.typeArticleen_US
Appears in Collections:Volume 13 No. 2

Files in This Item:
File SizeFormat 
Scheduling Problem under ... .pdf227.99 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.