Abstract:
The aim of this study is calculate cooling load for sport hall (1000 occupant) by mathematical relation, software program and select proper air conditioning devices and equipment.
Cooling load have been calculated by relation by using cooling load temperature difference (CLTD) and it founded 116TR, and software program by Hourly Analysis Program (HAP) and it founded 103TR then air duct dimension have been calculated by using McQuay duct sizer design tools by using constant head loss method.
Five air conditioning unit package (50Z030) 30TR capacity have been selected from CARRIER product CatLog.